FCG has executed several electrical engineering projects and equipment procurement for clients in the Public and Private Sectors. We execute turnkey projects involving design, procurement, project management/execution, testing and commissioning. Some major Turnkey Electrical Engineering Projects undertaken by FCG include:

- Design, construction and commissioning of 33kV bay at 132/33kV Transmission Station, Ilesha
- Design, Construction and Commissioning of 15.5km length 33kV Double Circuit Overhead Line from Kobape to Maloko for Ibadan Electricity Distribution Company
- Rehabilitation of major injection substations at LUTH 33/11KV S/S and Amuwo-Odofin 33/11KV Injection S/S for Eko Electricity Distribution Company
- Design, Construction & Commissioning of dedicated 33kV UG supply to the new Famfa Tower, Alfred Rewane Road, Ikoyi Lagos
- Construction of dedicated 33kV UG supply to the new Central Bank of Nigeria Complex, Marina, Lagos (incl. design, equipment procurement, testing & commission)
- Overhauling of existing and construction of new substations, Construction of MV lines, Rehabilitation of 33/11kV S/s at Fed. Univ. of Tech Akure
- Construction of a dedicated 11 KV feeder to Civic Centre Towers V.I. Lagos (incl. design, equipment procurement, testing & commission)
- Construction of dedicated 33kV OH feeder to the new Marriott Hotel, Oba Ladejobi, Ikeja GRA Lagos (incl. design, equipment testing & commission)
- Installation, testing & commissioning of 8-board 11kV indoor panels and rehabilitation of IBEDC Agodi 2 x15MVA 33/11kV injection S/s.
- Maintenance of 8No 1MVA 11/0.415kv trx, 26No 11kV Switchgears, 10No 11kV RMUs etc. at new CBN Tower Complex, Broad Street, Lagos
- Installation, testing and commissioning of 9-board 11 KV Control Panels and 11KV Metering Panel for LUTH 33/11kV Inj. S/s
- Installation, testing & commissioning of 7-board 11kV indoor panels and rehabilitation of IBEDC Eleyele 2 x15MVA 33/11kV injection S/s.
- Installation, Commissioning & Servicing of Nortroll Fault Passage Indicators & Network Management Solution for RCCG MV Network
- Installation, Commissioning & Servicing of Nortroll Fault Passage Indicators & Network Management Solution for Eko Electricity Distribution Company 11kV & 33KV Networks
- Complete Maintenance of 24No 11KV Switchgears, 8No Ring Main Units & 8No Distribution Transformers At Central Bank of Nigeria Complex, Broad Street, Lagos
 

Client Name: ETCO Nigeria Limited

 


Client Name: Eko Electricity Distribution Company (EEDC)


Client Name: ETCO Nigeria Limited

 

 

 

 


Client Name: Ibadan Electricity Distribution Company (IBEDC)


Client Name: Eko Electricity Distribution Company (EEDC)

 
     Quick Links
  REMOTE CONTROLLED METERING
POWER ENGINEERING

OPERATIONAL TOOLS & EQUIPMENT
COMPLETED WORKS
 
Customer Service Desk
TEL: 01-4545374
MOBILE: +234 909 953 5646
Email: enquiries@firstchoiceglobal.com
 
 

Site Map

Home
About Us
Services
Projects
Check Mail
Contact Us

Information

62, Bode Thomas Street,
Surulere, Lagos, Nigeria
Tel: +234 1 454 5374
Email: enquiries@firstchoiceglobal.com       

Follow us on:

Facebook
Twitter

 

© 2021 First Choice Ltd. All rights reserved.
 |  The name & Logo is a registered trademark.         |        Designed by: 1983Media